ONGOING PROJECTS ◄
Construction, Maintenance and Repair Work for Fresh water and Waste water systems of Avcilar and Esenyurt Municipalities, Department of European 2. Region Subscription Office in 2021 (4)
• Laying 65.000,00 m of bellmouth concrete in all diameters
• Laying 16.000,00 m of font ductile in all diameters
• Construction and repair of 52.000,00 m road of the branch.
• Fabrication of 17.500,00 m3 of plain concrete
• Fabrication and transportation of 240.000,00 m3 of crushed rock backfill