COMPLETED PROJECTS ◄
Bituminous Surface Treatment Work on Various Roads Within the Borders of the Branch Offices #41 (Bolu), #42 (Kizilcahamam) and #43 (Beypazari) of the Highways Administration
• Paving 5.335.000 m2 surface
• Fabrication of 575.000 tons of plantmix sub-foundation and foundation