Construction of Earth Works, Engineering Structures and Superstructure Works On (Susehri-Koyulhisar) Junction Sebinkarahisar Road Between Km: 0 + 000 - 28 + 940

• Construction of 29 km road
• Performing 1.800.000,00 m3 of cut excavation and roadside borrow excavation
• Fabrication of 32.000,00 m3 of reinforced concrete
• Fabrication of 400.000,00 tons of pmt and sub-foundation production
• Fabrication of 55.000,00 m3 of rubble
• Fabrication of 195.000,00 m3 non-stacked rubble backfill

PRINCIPAL
TCK - 16. Regional Directorate
of Highways - SIVAS
CONTRACT PRICE
14.001.778,00 $